When:
1st September 2020 – 18th September 2020 all-day
2020-09-01T00:00:00+01:00
2020-09-19T00:00:00+01:00

This bridge will be temporarily closed to enable repair works.  The damaged downstream parapet will be re-built and trrees removed from the upstream and downstream training walls.  During this time traffic will be diverted via Blodwell Bank, A495 and B4396.  Pedestrians will still have access over the bridge and there will be access to frontages.

Bridge repair works at Nantmawr Bridge